Project Facts
-
Client / Facility Owner: ADCO (facility owner for ADNOC onshore project)
-
Partners / Contractors (as listed): Al Dhafra Petroleum; Abdullah Fuad Impalloy Ltd (AFIC)
-
Project: Haliba Development Project
-
Scope: Drilling and installation of deep well beds.
Project Overview
Deep well beds form a critical element in cathodic protection systems where long-term integrity and acceptance depend on disciplined installation and clear evidence of completion. This scope required controlled field execution, interface coordination, and documentation readiness suitable for stakeholder review in an active development environment.
Scope of Work and Deliverables
The scope comprised drilling and installation of deep well beds for the Haliba development works. Deliverables were structured to support downstream CP activities and acceptance workflows.
Execution Approach
-
pre-mobilization alignment on access and work-front constraints;
-
controlled drilling progression under close supervision;
-
disciplined installation sequencing to protect installed components;
-
orderly closeout to enable review without extended clarifications.
Essential Transaction Codes Unveiled
“Deep drilling activities require strict work-front control (plant movement, lifting interfaces, rotating equipment). Practical safety controls and permit discipline are essential to protect personnel and maintain program continuity.”
hSE and Interface Control Tweet