Project Case Study – CP Drilling & Anode Installation (BAB/NEB)

Project Facts

  • Client: ADNOC Onshore 

  • Partner / Main Contractor: EMDAD LLC 

  • Project: Drilling and Anode Installation at ADNOC Onshore – BAB/NEB

  • Scope: Deep earth hole drilling; installation of anode; coke breeze

Project Overview

CP scopes succeed when installation quality and evidence-based verification are treated as a single controlled process. This project required deep earth drilling support and anode installation, including coke breeze, in an ADNOC field environment where safety controls and documentation readiness are decisive for acceptance.

Scope of Work

The works included deep earth hole drilling and installation of anodes, incorporating coke breeze as part of the CP installation system. The delivery emphasis is disciplined sequencing and traceability of installed works.

Execution Approach

  • controlled drilling progression and safe workfront management;

  • staged installation to protect integrity of CP components;

  • structured material handling practices (including backfill media);

  • documentation capture aligned to acceptance requirements.

 

Cathodic protection drilling UAE projects are won in the planning and protected in the daily controls. This case study summarises a deep earth hole drilling and anode installation support scope in a live onshore environment—what was required, how we controlled interfaces, and how we kept closeout ready for acceptance.

Cathodic protection drilling UAE is delivered with disciplined HSE controls, supervision, and documentation readiness in the UAE.