Project Facts
-
Client / Facility Owner: ADCO
-
Main Contractor: Petrofac
-
Project: Engineering, Procurement, Installation and Commissioning of Asab Full Field Development
-
Scope:
-
Earth hole drilling and installation work
-
Deep well drilling for CP and installation work
-
Drilling and installation work for water supply wells
-
General transportation services
-
Project Overview
This project combined multiple enabling workstreams under a single field development program. The delivery requirement was not only technical completion of each activity, but disciplined coordination between interfaces—so work fronts remained productive and acceptance remained documentation-ready.
Scope of Work
The listed scope integrated earthing works, CP deep well drilling and installation, water supply well drilling/installation, and general transportation services. Managing these in parallel requires clear sequencing and consistent execution standards.
Delivery Approach
-
pre-mobilization planning to align workfront priorities;
-
disciplined supervision to maintain safe, orderly operations;
-
structured reporting to keep stakeholders aligned on progress;
-
closeout organisation that keeps each workstream traceable and reviewable.
“The combined nature of drilling, installation, and transport services increases interface complexity. Practical risk controls—work zones, supervision, and permit discipline—are essential to maintain continuity and protect personnel. Closeout was structured to preserve scope traceability by workstream, supporting stakeholder review.”
HSE and Compliance Tweet