Power Network Upgrade P11550 – Earth Pit Installation and Testing Across ADCO Fields

Project Facts

  • Client / Facility Owner: ADCO (ADNOC onshore project context) 

  • Main Contractor (as listed): Siemens 

  • Project: Power Network upgrade for ADCO fields (Project No. P11550

  • Locations: BAB, BU HASA, ASAB, SHAH 

  • Scope: Drilling, supply (except earth rods), installation, inspection/testing of earth pits to ADCO requirements 

Project Overview

Earthing infrastructure is foundational to electrical reliability and safety. In multi-site programs, the principal execution challenge is consistency—repeatable installation outcomes, stand inspection/testing routines, and documentation that supports acceptance across multiple locations.

Scope of Work and Deliverables

The scope included drilling, supply (excluding earth rods), installation, and inspection/testing of earth pits across BAB, Asab, Shah, and Bu Hasa, aligned to ADCO specifications and requirements. 

Multi-Site Delivery Model

  • standard installation sequencing and site setup controls;

  • clear testing routines and repeatable reporting;

  • consistent closeout documentation to avoid site-by-site variation.

Closeout Package

Closeout is organized to support review efficiency across multiple locations, enabling sign-off without unnecessary rework.

Projects

More Related Projects

ADNOC MMV Baseline deep well drilling casing installation

ADNOC Ruwais dewatering well drilling PVC installation

ADNOC CALL-OUT PKG4 (OG159)