Project Facts
-
Client / Facility Owner: Abu Dhabi Company for On Shore Oil Operations (ADCO)
-
Partner / Main Contractor: National Petroleum Construction Company (NPCC)
-
Project: Qusahwira Field Development 1.8MM BOPD
-
Scope: Drilling and installation work for water supply wells and water disposal wells
Project Overview
Large field development programs require utility and disposal infrastructure that can keep pace with construction sequencing. This scope supported the program through drilling and installation of both water supply and water disposal wells, executed within a contractor-led delivery environment.
Scope and Deliverables
The deliverables comprised drilling and installation works for water supply wells and water disposal wells. The combined scope required disciplined coordination to maintain clarity across different well purposes and acceptance requirements.
Execution Approach
-
coordinate mobilization and logistics with the main contractor’s work-front plan;
-
maintain consistent drilling supervision and installation sequencing;
-
ensure installed works are compatible with downstream operational requirements;
-
deliver orderly closeout suitable for review and handover.
“We called Imagine Clany Eco when another company cancelled on us last minute for our move-out cleaning. Clany Eco was able to book us and make it out in 2 hours and did an amazing job. We even got our deposit back.”
HSE and Operational Controls Tweet
Documentation and Handover
Closeout is organized to support review and acceptance, with records that provide traceability of installed works and completion status.